FastReactPlan_-_Event_Planning_options

Article Public Number: KA-01222

Coats Digital Knowledge Article

Product: FastReactPlan

Purpose & Scope:

A guide explaining how to set up event planning options within FastReact

Instructions:

Go to [Set Up] > [Configure]> [Event Planning], the following window appears:

Production events enabled

This option turns on Order based critical path planning.

Allow inheritance

This option enables the inheritance of events on the order dialog. Only available under license.

Show materials within event schedule

This option enabled will show Order Material requirements that are linked to each event in the Event Framework. These will be visible in the strip Events dialog and in Reporting in the By Event for all Orders loop.

 

Note: Allow inheritance and Show materials within event schedule are mutually exclusive.

Material by order only

Show materials by order.

Force multi-update where configured > Default production days

For FastReact to calculate the Release Date (see Event framework), it needs to know the date on which the relevant order is planned to start. If an order is not planned then it will calculate the Release Date from the earliest delivery on the order, less the number of days that are entered here.

Development events enabled > Automatically link launch date to planned strips

This option turns on Product based critical path planning. Normally in FastReact the planner would have to manually enter the "Launch date" against each product,by using this option the launch date is set to the earliest planned strip for the product.

Link to Preparation date

Normally in FastReact you have to manually enter the "Launch date" against each product,by using this option FastReact will automatically set the launch date to the earliest planned strip for the product.

Link to Start of strip

Uses the Production start point as the date for linking launch dates in CP.

Problem if plan later than Launch date

When enabled FastReact will colour the strip orange if the strip is planned later than the launch date.

Problem if plan earlier than Launch date

When enabled, FastReact will colour the strip orange if the strip is planned earlier than the launch date.

Allow update of event start dates

Allows the start date column to be viewed and edited in the Event Update Dialog for the critical path.

[Update] button

Update any changes to the dialog.