Skip to content
English
  • There are no suggestions because the search field is empty.

FastReactPlan_-_How_to_change_strip_efficiency

Article Public Number: KA-01318

Coats Digital Knowledge Article

Product: FastReactPlan

Purpose & Scope:
When the daily planed output do not match with actual output after some days produced. Planner can adjust the efficiency to be lower/higher so that daily planned can be equivalent with actual.

Solution:
Strip right-click function -> Properties to change Strip efficiency for specific strip

Instructions:

  • Step 1: Right-click on the strip that user want to update its efficiency, select "Properties"

  • Step 2: To the Strip efficiency, insert the efficiency, and then click Update

    Outcome:
  • Before change Strip efficiency, daily plan as below and completed date is on 12-Jan-2025
  • If planner change Strip efficiency from 100 to 70, daily plan as below and completed date is on 15-Jan-2025

  • If planner change Strip efficiency from 100 to 120, daily plan as below and completed date is on 11-Jan-2025