VisionPLM_-_Scheduling
Article Public Number: KA-01042
Coats Digital Knowledge Article
Product: VisionPLM
Purpose & Scope:
Scheduling is an important area within the Administration section of VisionPLM, it allows you to set up when certain areas such as Reports and Imports will be sent out from VisionPLM, who they are sent to and also how often they are sent.
Instructions:
Settings
This area will detail if there are any schedules set up on the system, in order to enable schedules the Schedule Enabled check box will need to be ticked.
The Interval In Mins will specify the length of time between each scheduled run.
The Update button will need to be pressed to ensure any changes made are saved.
Scheduled Reports
This section will detail any Reports that have been created to run on a schedule. This will include the Day, Time, How it is produced and also the title of the report.
Scheduled Imports
This section runs in the same way as the Scheduled Reports area, however, this will show the information for any Imports into the system that are set up to run on a schedule.
Scheduled Whines
This section runs in the same way as both the Scheduled Reports and Scheduled Imports areas, however, this will show information from any Whines (Emails/ reminders) that are due to be sent out.
Scheduled Packages
This section runs the same as the previous sections, however, this will show information for a remote package that needs doing, for example, updates that need to be done on behalf of the customer such as dates.
Outcome:
You should now be able to set up schedules in your VisionPLM system in order to be able to effectively Report and also run Imports
Further reading:
Links to related articles